Edit or reschedule a load
Quick reference guide
1Open the existing load
Find the load on the Dispatch Board. Open its details instead of creating a replacement copy.
2Update the available fields
Use the load editing controls to revise the date, time, or assignment. Review any restrictions on completed work.
3Save and communicate
Wait for confirmation and verify the change on the board. Tell the affected hauler about revised instructions.